Maintain equipment operating efficiency at maximum with real-time ProductionACE MANUFACTURING DASHBOARD...
|
|
...by
detecting slowdowns, bottlenecks and problems
immediately, before production suffers. System
users report 5% to 15% productivity gains merely
from monitoring the shop floor in real-time.
Track every machine and department/group performance
in real-time with color coded "dashboard".
|
|
Green:
|
On target
|
|
Red:
|
Down
|
|
Yellow:
|
Slow/Fast
|
|
Light Blue:
|
In Setup
|
|
Dark Blue:
|
No Job Scheduled
|
|
Key to readings:
|
|
Average capacity, or OEE:
|
Plant Output as a percentage of maximum theoretical capacity
|
|
Average Up Time:
|
(Utilization) Total run time for the plant as percentage of total time available to run
|
|
Average Yield:
|
Total good parts produced as a percentage of total production
|
|
Average of STD Rate:
|
Current average plant rate of production as a percentage of standard rate
|
|
|

Click
here for larger image
Want
to know more about real-time and historical
OEE reporting? Click here.
|
"A 5% increase in productivity on 20 machines is equal to getting an extra machine for the cost of the system."
David Hidding, Dana Molded Products |
|
|
| Increase productivity by eliminating unnecessary machine adjustments. |
|
Operators and managers can see how long a machine takes to stabilize, so adjustments aren't made prematurely during stabilization periods or at shift/job/operator change. Displays of machine parameters and Setup Memo on MDT eliminates machine setup guesswork and maintains consistent machine settings between shifts.
"The number of presses running at or better than standard cycle has gone from approximately 50%-60% to 85%-95%."
Dennis Demet, S.C. Johnson, (Johnson Wax) |
|
|
| If you detect a problem in a particular machine, "zero in" on it... |
|
...with this Machine Detail screen. It displays complete information about an individual machine:
- Shift and Job Totals
- The product running and tooling for it
- Work Order and Product description
- Real-Time machine rate/cycle time
- Runtime and downtime data
- Cavities/molds/tools running (parts per cycle)
|

Click
here for larger image
|
|
| Output
Machine and Job status information to large "Marquee"
displays" |
|

Output Machine and Job status
information to large "Marquee" displays.
MDT-150 can be equipped with serial
output to drive third-party data displays with your
choice of Data Functions.
|