|
Maintain equipment operating efficiency at maximum with real-time ProductionACE MANUFACTURING AND OEE DASHBOARD...
|
|
...by
detecting slowdowns, bottlenecks and problems
immediately, before production suffers. System
users report 5% to 15% productivity gains merely
from monitoring the shop floor in real-time.
Track every machine and department/group performance
in real-time with color coded "dashboard".
|
|
Green:
|
On target
|
|
Red:
|
Down
|
|
Yellow:
|
Slow/Fast
|
|
Light Blue:
|
In Setup
|
|
Dark Blue:
|
No Job Scheduled
|
|
Key to readings:
|
|
Average capacity, or OEE:
|
Plant Output as a percentage of maximum theoretical capacity
|
|
Average Up Time:
|
(Utilization) Total run time for the plant as percentage of total time available to run
|
|
Average Yield:
|
Total good parts produced as a percentage of total production
|
|
Average of STD Rate:
|
Current average plant rate of production as a percentage of standard rate
|
|
|

Click
here for larger image
|
|
Rather than analyze performance reports the next day,
employees and management can act on real-time data, leading to
faster problem resolution and improved overall performance.
And, if you use our Machine Data Transducers providing real-time
performance data displayed at each machine, Operators now have a
sense of ownership in their performance because they can react
before problems affect production and quality.
|
|
|
Increase productivity by eliminating unnecessary machine
adjustments. |
|
Operators and managers can see how long a machine takes to stabilize,
so adjustments aren't made prematurely during stabilization periods or at
shift/job/operator change. Displays of machine parameters and Setup Memo on
MDT eliminates machine setup guesswork and maintains consistent machine
settings between shifts.
|
|
| If you detect a problem in a particular machine, "zero in" on it... |
|
...with
this Machine Detail screen. It displays complete information about an
individual machine:
- Shift and Job Totals
- The product running and tooling for it
- Work Order and Product description
- Real-Time machine rate/cycle time
- Runtime and downtime data
- Cavities/molds/tools running (parts per cycle)
|

Click
here for larger image
|
|
|
|
|
Benchmark your processes, then track results continuously.
|
|
Support your Lean, Continuous Improvement and Six Sigma initiatives with
accurate measurement of your defined metrics and key performance indicators.
Use easy-to-understand graphical displays like this to track progress,
inform Operators. (You can chart rate or cycle time). Additionally,
the system maintains a historical record of performance which can be
analyzed by machine, product, tooling, operator, shift, department, etc.
|

|
|
|
Production Manager/02
|
|
Production Manager/02 is an economical, real-time production data collection, performance and OEE monitoring system. Click here
for a summary data sheet to learn how you can improve your
manufacturing productivity-- no matter what kind of machine-based
manufacturing processes you employ. Or, contact us for a “live” system demonstration, or to order a low cost “pilot” evaluation system for a single machine.
|
|
|
Learn more about OEE at Downtime Central.
|
|

Downtime Central
- Exploring the True Cost of manufacturing downtime. Research and information
provided. Help managers justify maintenance cost. Machine downtime survey,
reports, power point presentations, resources, all free. |
|
|
Output Machine and Job status information to large "Marquee"
displays" |
|

Some MDT models can be equipped with serial output to drive third-party
data displays with your choice of Data Functions. |
|
| 10
ways to improve your manufacturing productivity |
Go to Automate production reporting>> |